|
The
installation site should be chosen so that an unrestricted
straight pipe of at least 3 Pipe Diameters is ensured.
The Pipe
Diameter should not be reduced directly in front of or
behind the meter.
All
Regulation of the flow should be done behind the meter.
The meter
must be installed in the pipe free of stress.
The
location of the meter should be such that it is not possible
for air pockets to develop in the meter I.e. the meter
should not be at high points in the pipeline or operated
under half full pipe conditions.
NOTE:
Refer to
Meinecke Water Meter Operating Instructions
(Pamphlet Y128E) for complete operating instructions. |